Higashi Nippori, Minor Refurbishment

2010/10/29

Upgrading of  common areas including an entrance hall which may affect a building image

-Minor refurbishment for an office building which was built in 1992

-Refurbishment completed in September 2010

Entrance Hall, Before Entrance Hall, After

-In order to make visitors straightforward access to the elevator hall, objects of bamboo stand with upper lightings was installed after taking planter boxes out.
-The area of the floor mat was replaced to carpet tiles.
-The stone floor around the bamboo stand was replaced to gravel.

Decorative Wall at Entrance Hall, Before Decorative Wall at Entrance Hall, After

-New lighting walls were installed on the both side of the decorative walls at the rear hall.

1st Floor Elevator Hall, Before 1st Floor Elevator Hall, After

-A tenant directory board was replaced.
-Carpet tiles were replaced.
-Ceiling boards were re-painted.

Typical Floor Elevator Hall, Before Typical Floor Elevator Hall, After

-Floor : Carpet tiles were replaced.(Pattern fixing)
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers around the floor signage were replaced by accent colors.
-Ceiling : Ceiling boards were repainted
-Down lightings : Lightings in front of elevators and floor signages were replaced.

Typical Floor Corridor, Before Typical Floor Corridor, After

-Floor : Carpet tiles were replaced. (Pattern fixing)
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers were replaced.
-Ceiling : Ceiling boards were repainted.
-Tenant doors : Steel doors were repainted.
-Down lightings : New lightings were installed in front of each tenant's door.

Typical Floor Male Toilet, Before Typical Floor Male Toilet, After

-Floor : PVC tiles were replaced.
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers were replaced partly by accent colors
-Ceiling : Ceiling boards were repainted.
-Down lightings : New ligtings were installed only in front of counters after taking louvers out.
-Water taps : All taps were unified.
-Soap boxes : All boxes were replaced to automatic ones.

Typical Floor Female Toilet, Before Typical Floor Female Toilet, After

-Floor : PVC tiles were replaced.
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers were replaced partly by accent colors
-Ceiling : Ceiling boards were repainted.
-Down lightings : New ligtings were installed only in front of counters after taking louvers out.
-Water taps : All taps were unified.
-Soap boxes : All boxes were replaced to automatic ones.