Upgrading of common areas including an entrance hall which may affect a building image
-Minor refurbishment for an office building which was built in 1992
-Refurbishment completed in September 2010
|
|
Entrance Hall, Before |
Entrance Hall, After |
-In order to make visitors straightforward access to the elevator hall, objects of bamboo stand with upper lightings was installed after taking planter boxes out.
-The area of the floor mat was replaced to carpet tiles.
-The stone floor around the bamboo stand was replaced to gravel.
|
|
|
Decorative Wall at Entrance Hall, Before |
Decorative Wall at Entrance Hall, After |
-New lighting walls were installed on the both side of the decorative walls at the rear hall.
|
|
|
1st Floor Elevator Hall, Before |
1st Floor Elevator Hall, After |
-A tenant directory board was replaced.
-Carpet tiles were replaced.
-Ceiling boards were re-painted.
|
|
|
Typical Floor Elevator Hall, Before |
Typical Floor Elevator Hall, After |
-Floor : Carpet tiles were replaced.(Pattern fixing)
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers around the floor signage were replaced by accent colors.
-Ceiling : Ceiling boards were repainted
-Down lightings : Lightings in front of elevators and floor signages were replaced.
|
|
|
Typical Floor Corridor, Before |
Typical Floor Corridor, After |
-Floor : Carpet tiles were replaced. (Pattern fixing)
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers were replaced.
-Ceiling : Ceiling boards were repainted.
-Tenant doors : Steel doors were repainted.
-Down lightings : New lightings were installed in front of each tenant's door.
|
|
|
Typical Floor Male Toilet, Before |
Typical Floor Male Toilet, After |
-Floor : PVC tiles were replaced.
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers were replaced partly by accent colors
-Ceiling : Ceiling boards were repainted.
-Down lightings : New ligtings were installed only in front of counters after taking louvers out.
-Water taps : All taps were unified.
-Soap boxes : All boxes were replaced to automatic ones.
|
|
|
Typical Floor Female Toilet, Before |
Typical Floor Female Toilet, After |
-Floor : PVC tiles were replaced.
-Skirting : PVC skirtings were replaced.
-Wall : Wallpapers were replaced partly by accent colors
-Ceiling : Ceiling boards were repainted.
-Down lightings : New ligtings were installed only in front of counters after taking louvers out.
-Water taps : All taps were unified.
-Soap boxes : All boxes were replaced to automatic ones.
|